So my last post on tidying the shack i had the radios in place where I thought I’d might like them, but of course I’ve made some changes as the tidying progresses !
I’m more than likely going to put a small adjustable shelf above the TS690S/FT659 and 2200H to allow for the other components that are used in connecting them.
build//test desk storage labelled
I’ve got the build and electrical test desk with the require microscope and oscilloscope setup. I’ve not got any kits to build at the moment, but I’m glad ive got a decent area to build and test in now. Getting things sorted and into boxes/labelling really takes the most time, but worth it once done, and plenty of capacity. I’ve kept the left side for ‘components’ and the right storage box for ‘hardware’ like screws/tools,etc.
still things to sort
I’ve still got my HF boxes/shelves to go thru and sorting thru the larger container boxes, but slowly the shack is getting better in being tidier and managable. Once everything is in place I’ll be using velcro to tidy the cables up. Next is to get the audio sorted with filter/amp and speakers back in place.