So a few very long nights and little sleep, but having been making the most of my lunch-break to get little jobs done on the base as well.
On 5/1 i received my Makita routing kit, its not ‘brilliant’ but got the job done as the photos show. Could put it on my Bosch SDS drill and make enough of a gap to get the washer and bolt onto the main bolt. With everything tightened up and in place i gave a very liberal dose of industrial superglue to secure everything in place. A day later it was ROCK SOLID ! very optimistic that i should get no more ‘wiggles’ from loose bolts !
that will keep the rain out bolts looking good fell over oops! a quick job waterproofing
As ever the English weather arrived right on queue. I had received this *awesome* ‘paint‘ the night before. Its actually for sealing leaking roofs, but principle is that it will keep the water out the wood. It is as thick as treacle to apply but one coat has left the wood well protected.It can take upto a week to dry, but hopefully it will be ‘dry to the touch’ ahead of the weekend so i can guy the antenna up.
Overall, i’m happy that the bolts on the end and glue will keep the mast secure on the bolt, and the paint will ensure the longevity of the wood on the base (or more so than it just being naked!).
Heres until the next update !
Al / 2E0FWE