Nebula progress 18/1/2021

Even thou a monday, i took advantage of the pre-daytime WFH sunshine to get small amounts of progress on the antenna.

I set about alining the radial plate and spreader plates. I actually make use of the ‘DX Commander’ stickers as an easy visual way of aligning the spreader plates, whilst I do have each of the vertical holes labelled (80/40/20) its still easier to see the stickers from a distance.

I threaded the 80 meter wire thru the top eyelet, which by now was totally rock-solid on the mast.

I also used my lunch break to attach the SO-230 – i found the tape very fiddly to work with, but nevertheless got it on to waterproof the connector. I’ve left the shield on for now. I then started on putting the tensioner loops into the 80m wire, which took me a bit longer than expected (sorry no photos!). but got the first one done at the 3 spreader.

I’m hoping the weather is ok tomorrow morning and I can get the last of the tension loops on the 80m wire in place, and all being well, get the mast vertical with the 80m wire going up it. A know the radials will take plenty of time to get out, so whilst I’m optimistic i might get a S.W.R. test tomorrow, realistically the first reading might not be until Wednesday.

Stay safe & 73 !

Alan / 2E0FWE